Worker A finishes the job in 10 hours; worker B finishes it in 12 hours, and worker C finishes it in 15 hours.
1. After A worked alone for two hours, and then B worked alone for 4 hours, how many hours will it take C alone to finish the remaining work?
It takes 40 minutes to fill a water tank, and 60 minutes to drain it.
2. If we try to fill the tank when empty while draining it for 1 minute, what fraction of the tank will be filled?
If they ask me that the tank is 2/3 full how will I find the minutes it will take to drain? Do I divided 60?